Dependent variable: post | |||||
---|---|---|---|---|---|
Source | Type III sum of squares | df | Mean square | F | Sig |
Corrected model | 17,371.65a | 2 | 8685.82 | 158.98 | .00 |
Intercept | 1297.87 | 1 | 1297.87 | 23.75 | .00 |
pre | 673.63 | 1 | 673.63 | 12.33 | .00 |
groups | 16,588.15 | 1 | 16,588.15 | 303.63 | .00 |
Error | 2895.47 | 53 | 54.63 | Â | Â |
Total | 668,923.00 | 56 | Â | Â | Â |
Corrected total | 20,267.12 | 55 | Â | Â | Â |